Air Defense Improvements
Field adaptation of the building designs provided by the administration in the facility no. 7, which was established on a total area of 500 decares, 40000 m2 asphalt road pavement, horizontal and vertical routes, site leveling and building grading, facility entrance control gate, parking areas, rain water control and drainage systems, Erosion control systems, perimeter firewall and road and auxiliary buildings for general settlement and infrastructure facilities.
Site adaptation of the building designs provided by the administration in the facility no. 6, which was established on a total area of 530 decares, 45000 m2 asphalt road pavement, horizontal and vertical routes, site leveling and building grading, facility entrance control gate, parking areas, rain water control and drainage systems, Erosion control systems, perimeter firewall and road and auxiliary buildings for general settlement and infrastructure facilities.
Site adaptation of the building designs provided by the administration in the facility no. 6, which was established on a total area of 530 decares, 45000 m2 asphalt road pavement, horizontal and vertical routes, site leveling and building grading, facility entrance control gate, parking areas, rain water control and drainage systems, Erosion control systems, perimeter firewall and road and auxiliary buildings for general settlement and infrastructure facilities.