Air Traffic Control Tower,Strategic Airlift Ramp, Armed Helicopter Ramp, Unarmed Helicopter Ramp

Air Traffic Control Tower,Strategic Airlift Ramp, Armed Helicopter Ramp, Unarmed Helicopter Ramp

Type:

Airports

Project Title:

Air Traffic Control Tower,Strategic Airlift Ramp, Armed Helicopter Ramp, Unarmed Helicopter Ramp

Project Location:

Iraq

Start Date:

09/2008

End Date:

02/2010

Management:

US Army Corps of Engineers Middle East District

Tender Price:

The air traffic management tower was designed in accordance with the standards as an 8-storey 28 m high reinforced concrete structure. Within the scope of the same project, preparation of the pavement, drainage and airport lighting projects of 300.000 m2 apron area for the parking of different purpose aircraft.