Force Protection Improvements
Designing new explosion-proof structures of the ESKO gate, south gate and main entrance gate verified with structural calculations in order to protect the military personnel at the entrances of Herat Military Base and increase the security level, and the general layout to provide operational traffic to meet user needs and auxiliary buildings for infrastructure facilities according to NATO standards.
Designing the surface pavement superstructure and horizontal & vertical geometry of the 13km south ring road according to AASHTO standards.
Projecting the northern and eastern perimeter firewalls of the base at the appropriate security level according to NATO standards.
Project design of a 60m2 15m high reinforced concrete security tower to support the eastern perimeter wall according to NATO standards.
Designing the surface pavement superstructure and horizontal & vertical geometry of the 13km south ring road according to AASHTO standards.
Projecting the northern and eastern perimeter firewalls of the base at the appropriate security level according to NATO standards.
Project design of a 60m2 15m high reinforced concrete security tower to support the eastern perimeter wall according to NATO standards.