Title II Oversight and Inspection Services for Repair Airfield Pavements
Projecting the temporary runway paints to be used during the construction process and the permanent paints to be found on the completed runway according to the current UFC requirements, preparation of the Runway Lighting System application projects, preparation of the application projects of the Equipment Foundations, horizontal and vertical design in accordance with the standards of the transportation and connection roads in the scope, and preparation of the application projects.