Nevşehir WWTP, Turkey

Nevşehir WWTP, Turkey

Type:

Environmental Facilities

Project Title:

Nevşehir WWTP, Turkey

Project Location:

Turkey

Start Date:

06/2008

End Date:

10/2009

Management:

NEVŞEHİR BELEDİYESİ

Tender Price:

The overall aim of this project is to accelerate Turkey's accession by enabling Turkey to achieve a high level of environmental protection and compliance with the EU directives concerning quality in the water sector.
The specific purpose of this project is to improve the environmental condition of the Karaağaç Creek and Kızılırmak River by reducing the pollution load through the construction of Nevşehir Wastewater Treatment Plant (Nevşehir WWTP).
The treatment plant will be an extended aeration activated sludge plant with physical and biological stages servicing a population of 125,000 persons and 9,000 industrial p.e. (stage one) The plant shall be designed for an expansion to cover 170,000 persons and 14,000 industrial p.e. (stage 2).
This plant includes many water retaining structures together with building type of structures listed below.
Aeration Tanks
Final Sedimentation Tanks
Screens
Collection and Distribution Chambers Return Sludge Pumping Stations
Grit and Grease Removal Tanks Sludge Buffer Tanks
Scum Pumping Station Cascade Aeration Units Parshall Flume
Chlorination Building
Sludge Dewatering Building Administration Building
Blower and Transformer Building Guard House